深海采矿扬矿管横向运动动态分析

刘江,毛纪陵,刘北英

中国工程科学 ›› 2001, Vol. 3 ›› Issue (11) : 74 -79.

PDF (3081KB)
中国工程科学 ›› 2001, Vol. 3 ›› Issue (11) : 74 -79.
研究报告

深海采矿扬矿管横向运动动态分析

作者信息 +

Dynamic Analysis for the Lateral Movement of a Lifting Pipe in Deep Sea Mining

Author information +
文章历史 +
PDF (3154K)

摘要

运用非线性有限元方法对深海采矿扬矿管的横向运动特性进行了研究;对影响扬矿管横向变形和动 态应力的各种因素作出详细的分析,提出了“位移滞后期”的概念,并分析了影响位移滞后的因素。

Abstract

Dynamic analysis for the lateral movement of a lifting pipe in deep sea mining is made by using nonlinear finite element method. The factors influencing the dynamic stress and deformation of the lifting pipe are analyzed in detail by means of AD IN A. A new concept of ‘displacement delaying time’ is put forward and related influencing factors are also discussed. The results obtained are of great importance to the design and operation of the lifting pipe.

关键词

深海采矿 / 扬矿管 / 动态应力 / 位移滞后期 / 非线性有限单元法

Key words

deep sea mining / lifting pipe / dynamic stress / displacement delaying time / nonlinear finite element method

引用本文

引用格式 ▾
刘江,毛纪陵,刘北英 深海采矿扬矿管横向运动动态分析[J]. 中国工程科学, 2001, 3(11): 74-79 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (3081KB)

27

访问

0

被引

详细

导航
相关文章

AI思维导图

/