Resource Type

Journal Article 2

Year

2017 1

2015 1

Keywords

Disassembly 1

Layout planning 1

Recovery 1

Simulation 1

WEEE 1

shallow buried; rich water soft soil; tunnel; pipe; reinforcement; cross-located right next door after disassembly type; excavation 1

open ︾

Search scope:

排序: Display mode:

Performance evaluation of waste electrical and electronic equipment disassembly layout configurations

Ozan Capraz, Olcay Polat, Askiner Gungor

Frontiers of Environmental Science & Engineering 2017, Volume 11, Issue 5, doi: 10.1007/s11783-017-0992-9

Abstract: Disassembly is one of the most important processes performed during the recovery of WEEE.The overall goal of disassembly is to maximize the retrieval of various metals and plastics containedThis study aims to evaluate alternative layout configurations for WEEE disassembly systems (WDS).

Keywords: WEEE     Recovery     Disassembly     Layout planning     Simulation    

Key construction technology of shallow-buried large span highway tunnel through rich water soft soil layer

Zhao Licai

Strategic Study of CAE 2015, Volume 17, Issue 1,   Pages 81-87

Abstract: with pipe drilling occlusal and linking reinforcement technology+cross-located right next door after disassembly

Keywords: shallow buried; rich water soft soil; tunnel; pipe; reinforcement; cross-located right next door after disassembly    

Title Author Date Type Operation

Performance evaluation of waste electrical and electronic equipment disassembly layout configurations

Ozan Capraz, Olcay Polat, Askiner Gungor

Journal Article

Key construction technology of shallow-buried large span highway tunnel through rich water soft soil layer

Zhao Licai

Journal Article