This paper summarizes the development of hydro-projects in China, blended with an international perspective. It expounds major technical progress toward ensuring the safe construction of high dams and river harnessing, and covers the theorization of uneven non-equilibrium sediment transport, inter-basin water diversion, giant hydro-generator units, pumped storage power stations, underground caverns, ecological protection, and so on.

Keywords

Dam / River harnessing / Water diversion / Pumped storage power station / Underground cavern / Ecological protection

Cite this article

Download citation ▾
Jinsheng Jia. A Technical Review of Hydro-Project Development in China. Engineering, 2016, 2(3): 302‒312 https://doi.org/10.1016/J.ENG.2016.03.008

References

[1]
Jia J, editor. Dam construction in China—a sixty-year review.Beijing: China Water & Power Press; 2015.
[2]
Jia J, Li N, Xu Z, Li G, Hao J, Mi Z, . Study on key technology for the safety of high CFRDs.Beijing: China Water & Power Press; 2014. Chinese.
[3]
Ma H, Chi F. Major technologies for safe construction of high earth-rockfill dams. Engineering 2016;2(4). Accepted.
[4]
Niu X. Key technology of the hydraulic structures of the Three Gorges Project. Engineering 2016;2(3). In press.
CrossRef Google scholar
[5]
Wang R. Key technologies and practices in the construction of ultra-high arch dams of 300 m level. Engineering 2016;2(3). In press.
CrossRef Google scholar
[6]
Chen H. Anti-seismic research for high concrete dams.Beijing: Higher Education Press; 2011. Chinese.
[7]
Xie S, Wu Y, Chen W. New technology and innovation on flood discharge and energy dissipation of high dams in China. J Hydraul Eng 2016,47(3):324–36. Chinese.
[8]
Liu Z, Zhang D, Zhang H, Wu Y. Hydraulic characteristics of converse curvature section and aerator in high-head and large discharge spillway tunnel. Sci China Technol Sc 2011;54(Suppl 1):33–9.
[9]
Hu C, An C, Chen J, Chen X. Optimum allocation of sediment in the Yellow River. Beijing: Science Press; 2012. Chinese.
CrossRef Google scholar
[10]
Han Q. Non-equilibrium transport of non-uniform suspended load.Beijing: Science Press; 2013. Chinese.
[11]
Liu Z, Wu Y, Chen W. Study on key hydraulic issues for the Middle Route Project of South-to-North Water Diversion.Beijing: China Water & Power Press; 2010. Chinese.
[12]
Wang H, Su Z, Xie X, Xie W, Xu H. Theory and practice on river basin ecological dispatchment.Beijing: China Water & Power Press; 2010. Chinese.

Acknowledgements