Research on Combined Construction Technology for Cross-Subway Tunnels in Underground Spaces

Xiangsheng Chen

Engineering ›› 2018, Vol. 4 ›› Issue (1) : 103-111.

PDF(3241 KB)
PDF(3241 KB)
Engineering ›› 2018, Vol. 4 ›› Issue (1) : 103-111. DOI: 10.1016/j.eng.2017.08.001
Research
Research

Research on Combined Construction Technology for Cross-Subway Tunnels in Underground Spaces

Author information +
History +

Abstract

Given the increasingly notable segmentation of underground space by existing subway tunnels, it is difficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study presents a combined construction technology that has been developed for use in underground spaces; it includes a deformation buffer layer, a special grouting technique, jump excavation by compartment, back-pressure portal frame technology, a reinforcement technique, and the technology of a steel portioning drum or plate. These technologies have been successfully used in practical engineering. The combined construction technology presented in this paper provides a new method of solving key technical problems in underground spaces in effectively used cross-subway tunnels. As this technology has achieved significant economic and social benefits, it has valuable future applications.

Graphical abstract

Keywords

Operating subway tunnel / Underground space / Construction / Combined technology

Cite this article

Download citation ▾
Xiangsheng Chen. Research on Combined Construction Technology for Cross-Subway Tunnels in Underground Spaces. Engineering, 2018, 4(1): 103‒111 https://doi.org/10.1016/j.eng.2017.08.001

References

[1]
X.S. Chen. The safety construction technology and application of subway connection project. Civil Eng Arch,2 (2016), pp. 24-34 [Chinese].
[2]
X.S. Chen. Engineering practice and innovation of underground space utilization in metro zone. China Communications Press, Beijing (2015) [Chinese].
[3]
X.S. Chen. The construction of ecological civilization of urban rail transit. China Railway Publishing House, Beijing (2015) [Chinese].
[4]
Z.J. Lin. Study on the effect of construction of undercrossing shield tunnel on the existing high-speed railway tunnel and its control technology. [dissertation]. Central South University, Changsha (2013) [Chinese].
[5]
X. Han, C. Liu, J.R. Standing. Structural settlement of existing tunnel caused by new tunnel excavated underneath. Chin Civil Eng J,45 (1) (2012), pp. 134-141 [Chinese].
AI Summary AI Mindmap
PDF(3241 KB)

Accesses

Citations

Detail

Sections
Recommended

/