
Risk, Contract Management, and Financing of the Gotthard Base Tunnel in Switzerland
Davide Fabbri
Engineering ›› 2019, Vol. 5 ›› Issue (3) : 379-383.
Risk, Contract Management, and Financing of the Gotthard Base Tunnel in Switzerland
[1] |
Leuenberger M. In the year of the tunnel. In: Proceeding of the Swiss Tunnel Congress 2016; 2016 Jun 15–17; Luzern, Switzerland. Zurich: Swiss Tunnelling Society; 2016. German.
|
[2] |
Ehrbar H., Zbinden P.. Organisation and processes. In: Tunnelling the Gotthard. Zurich: Swiss Tunnelling Society; 2016. p. 592-601.
|
[3] |
Dix A, Smith M, Celestino T, Neuenschwander M. Contractual practice. 2015-Activity report of Working Group 3 [Internet]. Geneva: ITA-AITES [cited 2019 Feb 19]. Available from: https://www.ita-aites.org/en/wg-committees/working-groups/200-ita-active-working-groups/workinggroup-3-contractual-practices/894-2015-activity-report.
|
[4] |
ITA-AITES. The ITA contractual framework checklist for subsurface construction contracts. Apr. ITA-AITES Report No.: 006
|
[5] |
Ehrbar H., Zbinden P.. Financing and cost management. In: Tunnelling the Gotthard Zurich. Regensdorf: Swiss Tunnelling Society; 2016. p. 614-623.
|
/
〈 |
|
〉 |