Abstract

As a core infrastructure of high-speed railways, ballast layers constituted by graded crushed stones feature noteworthy particle movement compared with normal railways, which may cause excessive settlement and have detrimental effects on train operation. However, the movement behavior remains ambiguous due to a lack of effective measurement approaches and analytical methods. In this study, an image-aided technique was developed in a full-scale model test using digital cameras and a color-based identification approach. A total of 1274 surface ballast particles were manually dyed by discernible colors to serve as tracers in the test. The movements of the surface ballast particles were tracked using the varied pixels displaying tracers in the photos that were intermittently taken during the test in the perpendicular direction. The movement behavior of ballast particles under different combinations of train speeds and axle loads was quantitatively evaluated. The obtained results indicated that the surface ballast particle movements were slight, mainly concentrated near sleepers under low-speed train loads and greatly amplified and extended to the whole surface when the train speed reached 360 km·h−1. Additionally, the development of ballast particle displacement statistically resembled its rotation. Track vibration contributed to the movements of ballast particles, which specifically were driven by vertical acceleration near the track center and horizontal acceleration at the track edge. Furthermore, the development trends of ballast particle movements and track settlement under long-term train loading were similar, and both stabilized at nearly the same time. The track performance, including the vibration characteristics, accumulated settlement, and sleeper support stiffness, was determined to be closely related to the direction and distribution of ballast particle flow, which partly deteriorated under high-speed train loads.

Graphical abstract

Keywords

High-speed railway / Full-scale model test / Image-aided technique / Ballast particle movement / Track vibration / Accumulated settlement

Cite this article

Download citation ▾
Xuecheng Bian, Wenqing Cai, Zheng Luo, Chuang Zhao, Yunmin Chen. Image-Aided Analysis of Ballast Particle Movement Along a High-Speed Railway. Engineering, 2023, 27(8): 161‒177 https://doi.org/10.1016/j.eng.2022.08.006

References

[1]
C. Madshus, A.M. Kaynia. High-speed railway lines on soft ground: dynamic behaviour at critical train speed. J Sound Vibr, 231 (3) (2000), pp. 689-701.
[2]
F. Lamas-Lopez, Y.J. Cui, N. Calon, S. Costa D’Aguiar, M. Peixoto De Oliveira, T.W. Zhang. Track-bed mechanical behaviour under the impact of train at different speeds. Soil Found, 56 (4) (2016), pp. 627-639.
[3]
A.D. Quinn, M. Hayward, C.J. Baker, F. Schmid, J.A. Priest, W. Powrie. A full-scale experimental and modelling study of ballast flight under high-speed trains. Proc Inst Mech Eng, F J Rail Rapid Transit, 224 (2) (2010), pp. 61-74.
[4]
E.T. Selig, J.M. Waters. Track geotechnology and substructure management. Thomas Telford, London (1994)
[5]
D. Mishra, E. Tutumluer, H. Boler, J.P. Hyslip, T.R. Sussmann. Railroad track transitions with multidepth deflectometers and strain gauges. Transp Res Rec, 2448 (1) (2014), pp. 105-114. DOI: 10.3141/2448-13
[6]
B. Indraratna, S. Nimbalkar, D. Christie, C. Rujikiatkamjorn, J. Vinod. Field assessment of the performance of a ballasted rail track with and without geosynthetics. J Geotech Geoenviron Eng, 136 (7) (2010), pp. 907-917.
[7]
L.L. Fu, S.H. Zhou, P.J. Guo, Z.K. Tian, Y.X. Zheng. Dynamic characteristics of multiscale longitudinal stress and particle rotation in ballast track under vertical cyclic loads. Acta Geotech, 16 (5) (2021), pp. 1527-1545. DOI: 10.1007/s11440-020-01098-1
[8]
C. Chen, B. Indraratna, G. McDowell, C. Rujikiatkamjorn. Discrete element modelling of lateral displacement of a granular assembly under cyclic loading. Comput Geotech, 69 (2015), pp. 474-484.
[9]
X. Zhang, C.F. Zhao, W.M. Zhai.Dynamic behavior analysis of high-speed railway ballast under moving vehicle loads using discrete element method. Int J Geomech, 17 (7) (2017), p. 04016157. DOI: 10.1061/(ASCE)GM.1943-5622.0000871
[10]
X.C. Bian, W. Li, Y. Qian, E. Tutumluer. Analysing the effect of principal stress rotation on railway track settlement by discrete element method. Geotechnique, 70 (9) (2020), pp. 803-821. DOI: 10.1680/jgeot.18.p.368
[11]
Y.L. Guo, V. Markine, X.H. Zhang, W.L. Qiang, G.Q. Jing. Image analysis for morphology, rheology and degradation study of railway ballast: a review. Transp Geotechnics, 18 (2019), pp. 173-211.
[12]
A. Aikawa. Determination of dynamic ballast characteristics under transient impact loading. Electron J Struct Eng, 13 (1) (2013), pp. 17-34.
[13]
S.S. Liu, H. Huang, T. Qiu, L. Gao.Comparison of laboratory testing using SmartRock and discrete element modeling of ballast particle movement. J Mater Civ Eng, 29 (3) (2017), p. D6016001. DOI: 10.1061/(ASCE)MT.1943-5533.0001540
[14]
L.L. Fu, Z.K. Tian, S.H. Zhou, Y.X. Zheng, B.L. Wang.Characterization of ballast particle’s movement associated with loading cycle, magnitude and frequency using SmartRock sensors. Granul Matter, 22 (3) (2020), p. 63. DOI: 10.1021/acs.jcim.9b00718
[15]
H.J. Pincus, W.W. Harris, G. Viggiani, M.A. Mooney, R.J. Finno.Use of stereophotogrammetry to analyze the development of shear bands in sand. Geotech Test J, 18 (4) (1995), p. 405. DOI: 10.1520/GTJ11016J
[16]
C. Zhao, J. Koseki, W.C. Liu. Local deformation behaviour of saturated silica sand during undrained cyclic torsional shear tests using image analysis. Geotechnique, 70 (7) (2020), pp. 621-629. DOI: 10.1680/jgeot.18.t.017
[17]
L.D. Suits, T.C. Sheahan, A.F. Sevi, L. Ge, W.A. Take. A large-scale triaxial apparatus for prototype railroad ballast testing. Geotech Test J, 32 (4) (2009), p. 102033. DOI: 10.1520/GTJ102033
[18]
O. Ajayi, L. Le Pen, A. Zervos, W. Powrie. A behavioural framework for fibre-reinforced gravel. Geotechnique, 67 (1) (2017), pp. 56-68.
[19]
G. Saussine, C. Cholet, P.E. Gautier, F. Dubois, C. Bohatier, J.J. Moreau. Modelling ballast behaviour under dynamic loading. Part 1: a 2D polygonal discrete element method approach. Comput Methods Appl Mech Eng, 195 (19-22) (2006), pp. 2841-2859.
[20]
J.J. Kumara, K. Hayano. Deformation characteristics of fresh and fouled ballasts subjected to tamping maintenance. Soil Found, 56 (4) (2016), pp. 652-663.
[21]
Y. Guo, W. Jia, V. Markine, G. Jing. Rheology study of ballast-sleeper interaction with particle image velocimetry (PIV) and discrete element modelling (DEM). Constr Build Mater, 282 (2021), p. 122710.
[22]
L. Le Pen, A.R. Bhandari, W. Powrie.Sleeper end resistance of ballasted railway tracks. J Geotech Geoenviron Eng, 140 (5) (2014), p. 04014004. DOI: 10.1061/(ASCE)GT.1943-5606.0001088
[23]
H. Liu, J.L. Xiao, P. Wang, G.Z. Liu, M.Y. Gao, S.Z. Li. Experimental investigation of the characteristics of a granular ballast bed under cyclic longitudinal loading. Constr Build Mater, 163 (2018), pp. 214-224.
[24]
T. Abadi, L. Le Pen, A. Zervos, W. Powrie. Improving the performance of railway tracks through ballast interventions. Proc Inst Mech Eng, F J Rail Rapid Transit, 232 (2) (2018), pp. 337-355. DOI: 10.1177/0954409716671545
[25]
National Railway Administration of the People's Republic of China. TB 10621-2014: Code for the design of high-speed railway. Chinese standard. Beijing: China Railway Publishing House; 2014. Chinese.
[26]
H.G. Jiang, X.C. Bian, C. Cheng, Y.M. Chen, R.P. Chen. Simulating train moving loads in physical model testing of railway infrastructure and its numerical calibration. Acta Geotech, 11 (2) (2016), pp. 231-242. DOI: 10.1007/s11440-014-0327-y
[27]
American Society for Testing and Materials.ASTM D2487-11: Standard practice for classification of soils for engineering purposes (unified soil classification system). US standard. ASTM International, West Conshohocken ( 2011)
[28]
R.P. Chen, Y.W. Wang, X.W. Ye, X.C. Bian, X.P. Dong. Tensile force of geogrids embedded in pile-supported reinforced embankment: a full-scale experimental study. Geotext Geomembr, 44 (2) (2016), pp. 157-169.
[29]
W. Li, X.C. Bian, X. Duan, E. Tutumluer. Full-scale model testing on ballasted high-speed railway: dynamic responses and accumulated settlements. Transp Res Rec, 2672 (10) (2018), pp. 125-135. DOI: 10.1177/0361198118784379
[30]
H. Takemiya, X.C. Bian. Substructure simulation of inhomogeneous track and layered ground dynamic interaction under train passage. J Eng Mech, 131 (7) (2005), pp. 699-711.
[31]
X.C. Bian, H.G. Jiang, C. Cheng, Y.M. Chen, R.P. Chen, J.Q. Jiang. Full-scale model testing on a ballastless high-speed railway under simulated train moving loads. Soil Dyn Earthquake Eng, 66 (2014), pp. 368-384.
[32]
C. Zhao, J. Koseki, T. Sasaki. Image based local deformation measurement of saturated sand specimen in undrained cyclic triaxial tests. Soil Found, 58 (6) (2018), pp. 1313-1325.
[33]
C. Zhao, J. Koseki. An image-based method for evaluating local deformations of saturated sand in undrained torsional shear tests. Soil Found, 60 (3) (2020), pp. 608-620.
[34]
T. Abadi, L. Le Pen, A. Zervos, W. Powrie. Measuring the area and number of ballast particle contacts at sleeper-ballast and ballast-subgrade interfaces. Int J Railw Technol, 4 (2) (2015), pp. 45-72. DOI: 10.4203/ijrt.4.2.3
[35]
H. Chebli, D. Clouteau, L. Schmitt. Dynamic response of high-speed ballasted railway tracks: 3D periodic model and in situ measurements. Soil Dyn Earthquake Eng, 28 (2) (2008), pp. 118-131.
[36]
D. Ramirez Cardona, J. Benkahla, S. Costa D’Aguiar, N. Calon, A. Robinet, H. Di Benedetto, et al.High-speed ballasted track behaviour with sub-ballast bituminous layer. In:Proceedings of the 2nd International Symposium on Railway Geotechnical Engineering (GeoRail 2014); 2014 Nov 6- 7; Paris, France, Ponts Formation Conseil, Paris (2014)
[37]
J.N. Varandas, A. Paixao, E. Fortunato, P. Holscher. A numerical study on the stress changes in the ballast due to train passages. Procedia Eng, 143 (2016), pp. 1169-1176.
[38]
A. Al Shaer, D. Duhamel, K. Sab, G. Foret, L. Schmitt. Experimental settlement and dynamic behavior of a portion of ballasted railway track under high speed trains. J Sound Vibrat, 316 (1-5) (2008), pp. 211-233.
[39]
C. Shi, C.F. Zhao, Y. Yang, Y.L. Guo, X. Zhang. Analysis of railway ballasted track stiffness and behavior with a hybrid discrete-continuum approach. Int J Geomech, 21 (3) (2021), p. 04020268.
PDF(10367 KB)

Accesses

Citations

Detail

Sections
Recommended

/