State-of-the-Art Technology in the Construction of Sea-Crossing Fixed Links with a Bridge, Island, and Tunnel Combination

Yaojun Ge , Yong Yuan

Engineering ›› 2019, Vol. 5 ›› Issue (1) : 15 -21.

PDF (1648KB)
Engineering ›› 2019, Vol. 5 ›› Issue (1) : 15 -21. DOI: 10.1016/j.eng.2019.01.003
Engineering Achievements
Engineering Achievements

State-of-the-Art Technology in the Construction of Sea-Crossing Fixed Links with a Bridge, Island, and Tunnel Combination

Author information +
History +
PDF (1648KB)

Keywords

EngineeringAchievements

Cite this article

Download citation ▾
Yaojun Ge, Yong Yuan. State-of-the-Art Technology in the Construction of Sea-Crossing Fixed Links with a Bridge, Island, and Tunnel Combination. Engineering, 2019, 5(1): 15-21 DOI:10.1016/j.eng.2019.01.003

登录浏览全文

4963

注册一个新账户 忘记密码

References

Funding

()

AI Summary AI Mindmap
PDF (1648KB)

1816

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/