PDF (876K)
摘要
In the background of the constrction of Su-tong Yangtze River bridge, the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced. Some key construction techniques, such as outspreading cable on deck, installing cable at pylon, pulling and fixing cable at the attachment with decks and cable PE protection, are discussed.
Abstract
In the background of the construction of Sutong Yangtze River Bridge (short as Sutong Bridge), the cable construction method and techniques of a thousandmeter scale cablestayed bridge are introduced. Some key construction techniques, such as outspreading cable on deck, installing cable at pylon, pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.
关键词
Key words
Technology for Long Cable Erection of Thousand-Meter Scale Cable-stayed Bridge[J].
中国工程科学, 2009, 11(1): 59-62 DOI: