Technology for Long Cable Erection of Thousand-Meter Scale Cable-stayed Bridge

Rao Huarong, Deng Huibin

中国工程科学 ›› 2009, Vol. 11 ›› Issue (1) : 59 -62.

PDF (856KB)
中国工程科学 ›› 2009, Vol. 11 ›› Issue (1) : 59 -62.

Technology for Long Cable Erection of Thousand-Meter Scale Cable-stayed Bridge

作者信息 +

Technology for long cable erection of a thousandmeter scale cablestayed bridge

Author information +
文章历史 +
PDF (876K)

摘要

In the background of the constrction of Su-tong Yangtze River bridge, the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced. Some key construction techniques, such as outspreading cable on deck, installing cable at pylon, pulling and fixing cable at the attachment with decks and cable PE protection, are discussed.

Abstract

In the background of the construction of Sutong Yangtze River Bridge (short as Sutong Bridge), the cable construction method and techniques of a thousandmeter scale cablestayed bridge are introduced. Some key construction techniques, such as outspreading cable on deck, installing cable at pylon, pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.

关键词

cable / hanging cable to deck / outspreading cable / installing calbe / tension / PE protection

Key words

a thousandmeter scale cablestayed bridge long cable / outspreading cable / the final scheme of construction technique for long cables / long cable construction

引用本文

引用格式 ▾
Rao Huarong, Deng Huibin Technology for Long Cable Erection of Thousand-Meter Scale Cable-stayed Bridge[J]. 中国工程科学, 2009, 11(1): 59-62 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (856KB)

36

访问

0

被引

详细

导航
相关文章

AI思维导图

/