Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
Fikri KUCUKSAYACIGIL, Gündüz ULUSOY
Frontiers of Engineering Management 2020, Volume 7, Issue 3, Pages 426-446 doi: 10.1007/s42524-020-0100-x
Keywords: genetic algorithm injection procedure maximum cash balance multi-objective multi-project multi-mode resource-constrained
Mohit Nahata, Chang Y. Seo, Pradeep Krishnakumar, Johannes Schwank
Frontiers of Chemical Science and Engineering 2018, Volume 12, Issue 1, Pages 194-208 doi: 10.1007/s11705-017-1647-x
Keywords: cellulose DAP activation heteroatom microporous
A Multi-objective Optimization Decision-making Model for Project Time - resource Tradeoff Problem
Wang Xianjia,Wan Zhongping
Strategic Study of CAE 2005, Volume 7, Issue 2, Pages 35-40
In the project scheduling and management, the time-resource tradeoff problem is to seek the objectivedetermine an efficient project scheduling according to some precedence relationship and the renewable resourceA new multi-objective optimization decision-making model with time-resource tradeoff problem is proposedprocedure by compromising and adjusting relationship between the project duration and the total consumed-resourcethis two-player game are given in the corresponding Lagrangian relaxation form associated with the resource
Keywords: project scheduling management time-resource tradeoff multiobject decision-making model resource-constrained
Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB
Frontiers of Engineering Management 2022, Volume 9, Issue 1, Pages 117-134 doi: 10.1007/s42524-020-0115-3
Keywords: project scheduling resource leveling between projects constrained resources game theory Benders decomposition
LIU Hongyi, WANG Fei, WANG Lei
Frontiers of Mechanical Engineering 2007, Volume 2, Issue 2, Pages 168-174 doi: 10.1007/s11465-007-0028-4
Keywords: predictive tracking corresponding stiffness algorithm
Robust train speed trajectory optimization: A stochastic constrained shortest path approach
Li WANG, Lixing YANG, Ziyou GAO, Yeran HUANG
Frontiers of Engineering Management 2017, Volume 4, Issue 4, Pages 408-417 doi: 10.15302/J-FEM-2017042
Keywords: train speed trajectory optimization railway operation stochastic programming
A constrained neural network model for soil liquefaction assessment with global applicability
Yifan ZHANG, Rui WANG, Jian-Min ZHANG, Jianhong ZHANG
Frontiers of Structural and Civil Engineering 2020, Volume 14, Issue 5, Pages 1066-1082 doi: 10.1007/s11709-020-0651-2
Keywords: soil liquefaction assessment case history dataset constrained neural network model existing knowledge
Jing LU, Yu XIANG, Qiao NI
Frontiers of Mechanical Engineering 2011, Volume 6, Issue 4, Pages 449-455 doi: 10.1007/s11465-011-0240-0
Keywords: active constrained layer damping (ACLD) plate dynamic characteristics semi-analytical method extended
Pulse Transiently Chaotic Neural Network for Nonlinear Constrained Optimization
Li Ying,Cao Hongzhao,Hu Yunchang,Shang Xiuming
Strategic Study of CAE 2004, Volume 6, Issue 5, Pages 45-48
Keywords: PTCNN penalty function nonlinear constrained optimization
Ruiming LI,Yan-An YAO
Frontiers of Mechanical Engineering 2016, Volume 11, Issue 2, Pages 159-169 doi: 10.1007/s11465-016-0398-6
In this study, a novel duoprism mechanism that demonstrates a fascinating eversion motion is developed. The mechanism comprises three scalable platforms and nine retractable limbs and is constructed by inserting prismatic and revolute joints into the edges and vertices of the duoprism, respectively. According to mobility and kinematic analyses, the mechanism has five degrees of freedom. Six inputs, including a redundant one, are required to overcome singularity and achieve an eversion motion. In the eversion motion, three platforms expand/contract synchronously, and the mechanism continuously turns inside out. The detailed gaits of eversion motion along an ellipse and a circle after a cycle are illustrated with two examples. A kinematic simulation is conducted, and a manual prototype is fabricated to verify the feasibility of the eversible duoprism mechanism.
Keywords: duoprism eversion motion singularity over-constrained
Manufacturing cost constrained topology optimization for additive manufacturing
Jikai LIU, Qian CHEN, Xuan LIANG, Albert C. TO
Frontiers of Mechanical Engineering 2019, Volume 14, Issue 2, Pages 213-221 doi: 10.1007/s11465-019-0536-z
Keywords: topology optimization manufacturing cost additive manufacturing powder bed
Yingjun WANG,David J. BENSON
Frontiers of Mechanical Engineering 2016, Volume 11, Issue 4, Pages 328-343 doi: 10.1007/s11465-016-0403-0
In this paper, an approach based on the fast point-in-polygon (PIP) algorithm and trimmed elements is proposed for isogeometric topology optimization (TO) with arbitrary geometric constraints. The isogeometric parameterized level-set-based TO method, which directly uses the non-uniform rational basis splines (NURBS) for both level set function (LSF) parameterization and objective function calculation, provides higher accuracy and efficiency than previous methods. The integration of trimmed elements is completed by the efficient quadrature rule that can design the quadrature points and weights for arbitrary geometric shape. Numerical examples demonstrate the efficiency and flexibility of the method.
Keywords: isogeometric analysis topology optimization level set method arbitrary geometric constraint trimmed element
Hohmann transfer via constrained optimization None
Li XIE, Yi-qun ZHANG, Jun-yan XU
Frontiers of Information Technology & Electronic Engineering 2018, Volume 19, Issue 11, Pages 1444-1458 doi: 10.1631/FITEE.1800295
Keywords: Hohmann transfer Nonlinear programming Constrained optimization Calculus of variations
Use of float consumption rate in resource leveling of construction projects
Atilla DAMCI, Gul POLAT, Firat Dogu AKIN, Harun TURKOGLU
Frontiers of Engineering Management 2022, Volume 9, Issue 1, Pages 135-147 doi: 10.1007/s42524-020-0118-0
Keywords: resource management resource leveling float consumption rate scheduling
A solution to stochastic unit commitment problem for a wind-thermal system coordination
B. SARAVANAN,Shreya MISHRA,Debrupa NAG
Frontiers in Energy 2014, Volume 8, Issue 2, Pages 192-200 doi: 10.1007/s11708-014-0306-x
Keywords: unit commitment (UC) randomness wind generation univariate chance constrained
Title Author Date Type Operation
Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
Fikri KUCUKSAYACIGIL, Gündüz ULUSOY
Journal Article
New approaches to water purification for resource-constrained settings: Production of activated biochar
Mohit Nahata, Chang Y. Seo, Pradeep Krishnakumar, Johannes Schwank
Journal Article
A Multi-objective Optimization Decision-making Model for Project Time - resource Tradeoff Problem
Wang Xianjia,Wan Zhongping
Journal Article
Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition
Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB
Journal Article
Fuzzy force control of constrained robot manipulators based on impedance model in an unknown environment
LIU Hongyi, WANG Fei, WANG Lei
Journal Article
Robust train speed trajectory optimization: A stochastic constrained shortest path approach
Li WANG, Lixing YANG, Ziyou GAO, Yeran HUANG
Journal Article
A constrained neural network model for soil liquefaction assessment with global applicability
Yifan ZHANG, Rui WANG, Jian-Min ZHANG, Jianhong ZHANG
Journal Article
Dynamic characteristics analysis of active constrained layer damping plate with various boundary conditions
Jing LU, Yu XIANG, Qiao NI
Journal Article
Pulse Transiently Chaotic Neural Network for Nonlinear Constrained Optimization
Li Ying,Cao Hongzhao,Hu Yunchang,Shang Xiuming
Journal Article
Manufacturing cost constrained topology optimization for additive manufacturing
Jikai LIU, Qian CHEN, Xuan LIANG, Albert C. TO
Journal Article
Geometrically constrained isogeometric parameterized level-set based topology optimization via trimmed
Yingjun WANG,David J. BENSON
Journal Article
Use of float consumption rate in resource leveling of construction projects
Atilla DAMCI, Gul POLAT, Firat Dogu AKIN, Harun TURKOGLU
Journal Article