Resource Type

Journal Article 4

Year

2019 1

2017 2

2016 1

Keywords

Conflict prediction 1

Fuzzy temporal knowledge reasoning 1

High-speed railway 1

Train timetable 1

backup train 1

disruption 1

energy saving 1

metro line 1

regenerative energy 1

speed profile optimization 1

timetable 1

train rescheduling 1

train timetable 1

urban rail transit 1

open ︾

Search scope:

排序: Display mode:

Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal

He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang

Engineering 2017, Volume 3, Issue 1,   Pages 150-150 doi: 10.1016/J.ENG.2017.01.002

High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning

He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang

Engineering 2016, Volume 2, Issue 3,   Pages 366-373 doi: 10.1016/J.ENG.2016.03.019

Abstract: random disturbances, this study addresses the issue of the fuzzification of time intervals in a train timetablebased on historical statistics and the modeling of a high-speed railway train timetable based on theThe results prove that conflict prediction after fuzzy processing of the time intervals of a train timetablereliable and practical and can provide helpful information for use in train operation adjustment, train timetablehttp://engineering.org.cn/EN/10.1016/J.ENG.2017.01.002">Corrigendum to “High-Speed Railway Train Timetable

Keywords: High-speed railway     Train timetable     Conflict prediction     Fuzzy temporal knowledge reasoning    

Energy-saving operation approaches for urban rail transit systems

Ziyou GAO, Lixing YANG

Frontiers of Engineering Management 2019, Volume 6, Issue 2,   Pages 139-151 doi: 10.1007/s42524-019-0030-7

Abstract: speed profile optimization, utilization of regenerative energy, and integrated optimization of train timetable

Keywords: urban rail transit     energy saving     speed profile optimization     regenerative energy     train timetable    

Metro train rescheduling by adding backup trains under disrupted scenarios

Jiateng YIN, Yihui WANG, Tao TANG, Jing XUN, Shuai SU

Frontiers of Engineering Management 2017, Volume 4, Issue 4,   Pages 418-427 doi: 10.15302/J-FEM-2017044

Abstract: Metro dispatchers have taken a practical strategy of rescheduling the timetable and adding several backup

Keywords: train rescheduling     backup train     metro line     disruption     timetable    

Title Author Date Type Operation

Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal

He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang

Journal Article

High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning

He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang

Journal Article

Energy-saving operation approaches for urban rail transit systems

Ziyou GAO, Lixing YANG

Journal Article

Metro train rescheduling by adding backup trains under disrupted scenarios

Jiateng YIN, Yihui WANG, Tao TANG, Jing XUN, Shuai SU

Journal Article