Search scope:
排序: Display mode:
Qixiang FAN
Frontiers of Engineering Management 2017, Volume 4, Issue 2, Pages 231-237 doi: 10.15302/J-FEM-2017103
Keywords: cement large-discharge and high-velocity spillway tunnels large scale underground powerhouse green hydropowerstation sustainable development Xiluodu hydropower station
Ertan Hydropower Station-The Largest Hydropower Station in China Built in this Century
黄新生
Strategic Study of Chinese Academy of Engineering 1999, Volume 1, Issue 1, Pages 86-86
The design of Three Gorges Hydropower Station
Zhou Shuda,Xie Hongbing
Strategic Study of Chinese Academy of Engineering 2011, Volume 13, Issue 7, Pages 78-84
Keywords: Three Gorges Power Station layout sediment and floating debris discharging spiral case embedding
Wang Shougen
Strategic Study of Chinese Academy of Engineering 2005, Volume 7, Issue 3, Pages 78-83
The abutment is the part where the by-pass seepage and contact erosion often happen to make the dam not work normally, which is the key point during design and construction, so Design Specifications for Rolled Earth-Rock Fill Dams (SL274-2001) require excavating into the slightly weathered rock mass for the core wall and the reversed filter and the abutment. The spreading gradation earth-rock fill dam with crushed-stone-earth core wall is 123m high, and the highly weathering natural depth of the phyllite and sandstone at abutments on both bank is 14.6~66.4m. According to the Specification, the excavation quantity is enormous. It is practically excavated into the highly weathering zone, which can not meet with the Specification. The treatment scheme for the highly weathering rock mass on both abutments and grouting tests and grouting technics are introduced in detail. The feasibility to adopt consolidation grouting and seepage treatment measures is argued and the treatment measures and construction control standards are proposed.
Keywords: Qiaoqi Hydropower Station earth-rock dam treatment of abutment highly weathered rock mass consolidation
Wang Shougen
Strategic Study of Chinese Academy of Engineering 2004, Volume 6, Issue 7, Pages 88-93
The dam of Qiaoqi Hydropower Project is 123m high, in which it is the first time for the spreading
Keywords: Qiaoqi Hydropower Project spreading gradation crushed stones and earth impervious material engineering
Li Jianming
Strategic Study of Chinese Academy of Engineering 2004, Volume 6, Issue 5, Pages 79-82
Through researching on a rock slope by the improved CSF methods,the paper works out not only the security coefficient of the slope but also its critical slip surface, the influence factors and slip causes. It is proved that the author's ideas and ways, which can be studied and applied,are easy, appropriate, significant and reliable.
Keywords: CSF computing methods rock slope stability
Gao Xueping,Chen Hong,Song Huifang
Strategic Study of Chinese Academy of Engineering 2011, Volume 13, Issue 12, Pages 63-67
Keywords: thermally stratified reservoir hydropower station intake stop-log gate formula of water temperature
Innovation of Management and Science and Technology in Phase I Construction of TGP
Dai Huichao,Cao Guangjing
Strategic Study of Chinese Academy of Engineering 2005, Volume 7, Issue 1, Pages 50-59
Keywords: Three Gorges dam hydropower station ship lock generating set river closure management
An information management system of safety assessment and warning for high earth-rockfill dam
Zhang Zongliang,Yu Yuzhen,Zhang Bingyin
Strategic Study of Chinese Academy of Engineering 2011, Volume 13, Issue 12, Pages 33-37
Based on the monitoring data, a practical information management system of safety assessment and warning for Nuozhadu earth-rockfill dam is developed. The system includes system management module, safety criteria module, monitoring data and engineering information module, numerical calculation module, back-analysis module, safety warning and contingency plan module, and data base and management module. The numerical calculation and back-analysis modules are the key parts, which perform analysis of seepage, stress and deformation of dam, crack of dam, dynamic response and slope stability. The parameters of constitutive model are back-analyzed by using the monitoring data and the behaviors of the dam at some important time are predicted.
Keywords: Nuozhadu Hydropower Station dam safety assessment warning information management system back-analysis
The “Tiangong” Chinese Space Station project
Yang HONG
Frontiers of Engineering Management 2018, Volume 5, Issue 2, Pages 278-283 doi: 10.15302/J-FEM-2018202
Keywords: manned space station space station project basic design
Analysis of synergy degree and its influencing factors in hydropower EPC project management
Jiwei ZHU, Hua GAO, Jiangrui WANG
Frontiers of Engineering Management 2021, Volume 8, Issue 3, Pages 402-411 doi: 10.1007/s42524-020-0098-0
Keywords: hydropower project EPC mode synergy degree model grey relational analysis
Frontiers of Structural and Civil Engineering Pages 704-717 doi: 10.1007/s11709-021-0746-4
Keywords: shallow tunneling method pile and rib method ground surface settlement subway station construction
Sketch of mid-long term (2030, 2050) development strategy study of hydropower in China
Yan Zhiyong, Qian Gangliang
Strategic Study of Chinese Academy of Engineering 2011, Volume 13, Issue 6, Pages 108-112
Based on the hydropower potential and distribution features,analyze thestatus and role of hydropower in China, review the history of hydropower development and current situation, contrast and analyze the differences of hydropower development in China and some other overseas countries, present strategy route and target and key point of hydropower development in China and present measuresand suggestions to hydropower development in future.
Keywords: hydropower resources hydropower development target key point support measures
China’s hydropower energy system toward carbon neutrality
Frontiers of Engineering Management Pages 677-682 doi: 10.1007/s42524-022-0196-2
Keywords: hydropower system carbon neutrality artificial intelligence
Seismic responses of subway station with different distributions of soft soil in Tianjin
Dejian YANG,Meiling DUAN
Frontiers of Structural and Civil Engineering 2014, Volume 8, Issue 2, Pages 187-193 doi: 10.1007/s11709-014-0252-z
Keywords: distribution of soft soil soft soil in Tianjin seismic response ANSYS
Title Author Date Type Operation
Technology improvements and management innovations in construction of Xiluodu hydropower station on Jinsha
Qixiang FAN
Journal Article
Ertan Hydropower Station-The Largest Hydropower Station in China Built in this Century
黄新生
Journal Article
Treatment of Highly Weathered Rock Mass at the Abutment of Earth-Rock Dam in Qiaoqi Hydropower Project
Wang Shougen
Journal Article
Characteristics and Design of the Crushed Stones and Earth as Impervious Material for the Dam in Qiaoqi HydropowerStation
Wang Shougen
Journal Article
Research on the Stability of a Slope in One Hydropower Station by the Improved Critical Slip Field (CSF
Li Jianming
Journal Article
A prediction formula of water temperature released from the multi-level stop-log gate intake of hydropower
Gao Xueping,Chen Hong,Song Huifang
Journal Article
Innovation of Management and Science and Technology in Phase I Construction of TGP
Dai Huichao,Cao Guangjing
Journal Article
An information management system of safety assessment and warning for high earth-rockfill dam
Zhang Zongliang,Yu Yuzhen,Zhang Bingyin
Journal Article
Analysis of synergy degree and its influencing factors in hydropower EPC project management
Jiwei ZHU, Hua GAO, Jiangrui WANG
Journal Article
Comparison of shallow tunneling method with pile and rib method for construction of subway station in
Journal Article
Sketch of mid-long term (2030, 2050) development strategy study of hydropower in China
Yan Zhiyong, Qian Gangliang
Journal Article