大型水电项目融资与资本运作——三峡工程10年来的融资策略及实践

李永安

中国工程科学 ›› 2003, Vol. 5 ›› Issue (10) : 1-7.

PDF(5128 KB)
PDF(5128 KB)
中国工程科学 ›› 2003, Vol. 5 ›› Issue (10) : 1-7.
专题报告

大型水电项目融资与资本运作——三峡工程10年来的融资策略及实践

  • 李永安

作者信息 +

Financing & Capital Operations of Large Hydropower Projects——A Summary Review of Financing Strategies & Practices in Three Gorges Project

  • Li Yongan

Author information +
History +

摘要

通过对三峡工程建设10年来的融资策略及实践的总结,深入分析了大型水电项目的融资及资本运作的基本特点,详细论述了在大型水电项目建设管理中如何优化融资结构、降低融资成本、构建持续融资和资本运作载体方式等。

Abstract

By summing up the financing strategies and practices in the ten year´s construction of the Three Gorges Project, the paper analyzes thoroughly the features and characteristics of financing and capital operations in large hydropower projects. Meanwhile proposals have also been presented for the optimization of financing structure, lowering financing costs and setting up a carrier for sustainable financing and capital operations in large hydropower project construction.

关键词

水电项目 / 融资 / 资本运作

Keywords

Hydropower project / financing / capital operations

引用本文

导出引用
李永安. 大型水电项目融资与资本运作——三峡工程10年来的融资策略及实践. 中国工程科学. 2003, 5(10): 1-7

参考文献

PDF(5128 KB)

Accesses

Citation

Detail

段落导航
相关文章

/