三峡工程三期RCC围堰工程

张曙光

中国工程科学 ›› 2003, Vol. 5 ›› Issue (11) : 79-81.

PDF(1778 KB)
PDF(1778 KB)
中国工程科学 ›› 2003, Vol. 5 ›› Issue (11) : 79-81.
技术创新

三峡工程三期RCC围堰工程

  • 张曙光

作者信息 +

Phase Ⅲ RCC Cofferdam Construction of TGP

  • Zhang Shuguang

Author information +
History +

摘要

三期RCC围堰工程项目是确保三峡工程2003年蓄水、通航和发电目标按期实现的关键项目,也是右岸厂房坝段和右岸电站厂房等后续施工项目安全施工的保障。受施工通航、施工场地及工期条件等限制,三期RCC围堰的混凝土施工强度和上升高度均超过目前现有施工水平,针对这些难点开发出有效的处理工艺,保证了围堰工程的实施。

Abstract

The phase Ⅲ RCC cofferdam construction belongs to the phase Ⅲ diversion works. It is a key item to ensure achievement of the reservoir impoundment, navigation and power generation in 2003 and the guarantee to the safety construction of the follow-up right-bank intake dam section and the powerhouse. Restrained by navigation while construction, the construction site and duration, both the concreting intensity and the rise height of the phase Ⅲ RCC cofferdam exceed the current construction level. In view of these difficulties, a huge amount of research work has been performed by relevant departments and is described in the paper.

关键词

三峡工程 / RCC围堰 / 混凝土

Keywords

TGP / RCC cofferdam / concrete

引用本文

导出引用
张曙光. 三峡工程三期RCC围堰工程. 中国工程科学. 2003, 5(11): 79-81

参考文献

PDF(1778 KB)

Accesses

Citation

Detail

段落导航
相关文章

/