Fast Reactor Technology Development in China Status and Prospects

Xu Mi

中国工程科学 ›› 2007, Vol. 9 ›› Issue (4) : 76-83.

中国工程科学 ›› 2007, Vol. 9 ›› Issue (4) : 76-83.

  • Xu Mi
作者信息 +

Fast Reactor Technology Development in China Status and Prospects

  • Xu Mi
Author information +
History +

Abstract

China has decided to speedup the nuclear power development. It is programmed that the nuclear power capacity will reach 40 GWe in 2020 and envisaged 60 GWe and 240 GWe in 2030 and 2050 respectively. The basic strategy of PWRFBR matched development with Fast reactor metal fuel closed cycle for a sustainable and quick increasing nuclear energy supply is adopted. Another strategy also decided is that the partitioning and transmutation of MA will be realized using fast burner and ADS.The fast reactor engineering development will be divided into three steps: China Experimental Fast Reactor (CEFR 65 MWt/20 MWe), China Prototype/Demonstration Fast Reactor (CPFR/CDFR ≥ 1 500 MWt/600 MWe) and China Demonstration Fast Breeder Reactor (CDFBR 1 000~1 500 MWe). The CEFR is under installation and preoperation testing with it’s first criticality planned in 2009. The design study of CPFR is just started in 2006. Recently a discussion for the second step is under way to faster the fast reactor development by a larger than 600 MWe CPFR and as a role of CDFR.

Keywords

fast reactor development strategy / breeder / burner / China experimental fast reactor

引用本文

导出引用
Xu Mi. . 中国工程科学. 2007, 9(4): 76-83

参考文献

Accesses

Citation

Detail

段落导航
相关文章

/