Study on Project Progress Curve Model

Ding Shibao

中国工程科学 ›› 2008, Vol. 10 ›› Issue (1) : 74-78.

PDF(100 KB)
PDF(100 KB)
中国工程科学 ›› 2008, Vol. 10 ›› Issue (1) : 74-78.

Study on Project Progress Curve Model

  • Ding Shibao
作者信息 +

Study on Project Progress Curve Model

  • Ding Shibao
Author information +
History +

摘要

none

Abstract

Because of the discrepancy of project types, the project progress curves present different characteristics. Studying project progress curves can reduce management risk of project and overall grasp the enforcement condition of the project. Combining project characteristic, this paper reaches 4 kinds of project progress curve patterns. If the front of the progress curve is concave, and its rear is protruding in the break point, it is named as S model. If its front is protruding and its rear is concave in the break point, it is named as the reverse side of S model. If the front and rear are concave in the break point, it is named as J model, and two half sections are both upward protruding, it is named as the reverse side of J model. Through a case study, it shows that application project progress curve model can better raise project management.

关键词

none /

Keywords

progress curve model / reverse side of S model / reverse side of J model

引用本文

导出引用
Ding Shibao. Study on Project Progress Curve Model. 中国工程科学. 2008, 10(1): 74-78

参考文献

PDF(100 KB)

Accesses

Citation

Detail

段落导航
相关文章

/