工程哲学与神东亿吨矿区创新实践

王安

中国工程科学 ›› 2008, Vol. 10 ›› Issue (12) : 53-57.

PDF(1048 KB)
PDF(1048 KB)
中国工程科学 ›› 2008, Vol. 10 ›› Issue (12) : 53-57.

工程哲学与神东亿吨矿区创新实践

  • 王安

作者信息 +

Project philosophy and innovation practice of Shendong 100-million-ton mining area

  • Wang An

Author information +
History +

摘要

工程哲学指导工程实践。神东矿区在煤矿开发建设创新实践中遵循“系统性、客观性、时效性”的理性思维,系统思考,整体推进,寻找主客观最佳结合,及时掌握和集成新技术、新材料、新装备、新工艺,建设了不同于传统模式的千万吨矿井,建成世界上首个亿吨级煤炭生产基地。全员工效、生产规模、安全、环保水平、资源回收率等指标达到国际领先水平。

Abstract

Project philosophy guides project practice. In the innovation practice of coal mine construction and development, Shendong mining area abides by the project philosophy of "systematism, objectiveness, efficiency" , and finds the best combination of subjectiveness and objectiveness through systematic thinking and whole advancement. By in-time management and integration of new technology, new material, new equipment and new technique, Shendong has succesfully constructed the 10-milllion-ton mine group different from the traditional mode, and established the first 100-million-ton coal mining production base in the world. Shendong's overrall productivity efficiency, production scale, safety level, environmental-protection level and resource recovery rate all reach the world advanced level.

关键词

神东矿区 / 煤炭开发 / 系统性 / 客观性 / 时效性

Keywords

Shendong mining area / coal mine development / systematism / objectiveness / efficiency

引用本文

导出引用
王安. 工程哲学与神东亿吨矿区创新实践. 中国工程科学. 2008, 10(12): 53-57

参考文献

PDF(1048 KB)

Accesses

Citation

Detail

段落导航
相关文章

/