
中国改进型压水堆核电技术——CPR1000的形成
濮继龙
The Formation of the Improved Chinese Pressurized Water Reactor Technology—CPR1000
Pu Jilong
介绍了目前正在建设的岭澳核电站(二期)和辽宁红沿河核电站所采用技术——CPR1000的形成过程及其中的重要技术创新点。
This paper introduces the formation of the Improved Chinese PWR technology—CPR1000 which is applied in Ling Ao Nuclear Power Station (Phase II) and Liaoning Hongyanhe Nuclear Power Station, and its key technological innovations.
pressurized water reactor / CPR1000 / self-owned brand
/
〈 |
|
〉 |