基于效用的施工导流方案多目标决策模型

范锡峨()1,2、胡志根1、刘全1

中国工程科学 ›› 2008, Vol. 10 ›› Issue (7) : 137-140.

PDF(577 KB)
PDF(577 KB)
中国工程科学 ›› 2008, Vol. 10 ›› Issue (7) : 137-140.

基于效用的施工导流方案多目标决策模型

  • 范锡峨()1,2、胡志根1、刘全1

作者信息 +

Multi-objective decision model for construction diversionschemes based on utility

  • Fan Xi'e1,2、Hu Zhigen1、Liu Quan1

Author information +
History +

摘要

根据水电工程导流方案的选择与导流建筑物的投资费用、工期、系统风险率及其风险损失之间的关 系,提出确定决策者效用函数的方法;运用多目标决策理论建立基于效用的施工导流方案决策模型,对考虑 决策者的风险偏好拟定的导流方案集进行优选。实例分析表明,基于效用的施工导流方案多目标决策模型 能够反映决策者的风险偏好,按照正隶属度极大原则优选导流方案,使决策者获得最大的满意度。

Abstract

Based on the relation between the choice of diversion schemes and the investment cost,period,risk, its risk loss of diversion structure,the paper puts forward the utility function of decision makers.When calculating three decision indexes of risk,period and utility of risk loss, this paper presents a multi-objective decision-making method for diversion schemes considering the utility of risk loss by applying multi-objective decision-making theory. The case study shows that the result of decision making by the multi-objective decision model based on utility reflects the decision maker's favor to his risk preference and his fullest satisfaction.

关键词

施工导流方案 / 效用损失 / 多目标决策模型 / 风险偏好

Keywords

diversion scheme / utility losing / multi-objective decision / risk preference

引用本文

导出引用
范锡峨,胡志根,刘全. 基于效用的施工导流方案多目标决策模型. 中国工程科学. 2008, 10(7): 137-140

参考文献

基金
国家自然科学基金委员会、二滩水电开发有限责任公司,雅砻江水电开发联合研究基金项目(50539120);国家自然科学基金资助项目(50579056)
PDF(577 KB)

Accesses

Citation

Detail

段落导航
相关文章

/