三峡船闸完建期156 m蓄水位4级运行方式原型调试研究
Study on four-step operational mode prototype debugging of TGP lock under impounded level 156 m in the finishing construction period
Hu Ya'an、Zhang Ruikai、LiYun
从水力学条件论证了船闸采用4级运行方案的可行性。通过原型调试,采取中间及阐首优化后的输水方式运行,基本消除了闸室第一分流口空化,船闸在超过设计的45.2 m水头下工作条件较好,在三峡船闸完建期156 m蓄水位船闸采用4级运行方式具优越性。
This paper expounds the superiority of adopting four-step operational mode for TGP lock under impounded level 156 m in the finishing construction period, and demonstrates the feasibility of adopting four-step operational mode with the hydraulic conditions. After adopting the optimizing water conveyance pattern by means of prototype debug, the cavitation of the 1st-bifurcation at mid chamber has been basically eliminated, the working conditions of the lock under exceeding design water head 45.2 m has been confirmed well, therefore, the four-step operational mode can be adopted for TGP lock.
TGP lock / operational mode / prototype debugging
/
〈 |
|
〉 |