城市富水砂卵石地层大断面泥水盾构工艺参数变化对施工成本的影响

王颖()

中国工程科学 ›› 2010, Vol. 12 ›› Issue (12) : 108-112.

PDF(641 KB)
PDF(641 KB)
中国工程科学 ›› 2010, Vol. 12 ›› Issue (12) : 108-112.

城市富水砂卵石地层大断面泥水盾构工艺参数变化对施工成本的影响

  • 王颖()

作者信息 +

The economic impact analysis of process parameters change of large section slurry shield in urban water-rich sandy gravel stratums

  • Wang Ying

Author information +
History +

摘要

以北京铁路地下直径线盾构隧道施工为例,介绍了不同工程地质及施工边界条件变化时的工艺参数选择原则,并通过对工艺参数调整时的施工效率、机具材料消耗统计,分析了成本的差异及变化。

Abstract

Taking the underground diameter shield construction of Beijing railway for example, the choosing principles of process parameters in different engineering geo-conditions and changing boundary conditions were introduced. The cost difference and change were analyzed according to the analysis of construction efficiency and machine material consuming when the process parameters were adjusted.[

关键词

盾构施工 / 工艺参数 / 经济分析

Keywords

shield construction / process parameter / cost analysis

引用本文

导出引用
王颖. 城市富水砂卵石地层大断面泥水盾构工艺参数变化对施工成本的影响. 中国工程科学. 2010, 12(12): 108-112