摘要

针对北京富水砂卵石地层大断面隧道地层稳定性差、工程周边环境复杂、对沉降控制要求高等诸多难题,在大断面隧道中采用CRD法、洞桩法进行施工,有效控制了工程结构、沿线及周围建筑物和地下管线的变形,确保了工程及周围环境的安全。

Abstract

The CRD(cross diaphragm) and hole pile method were adopted in the large section tunnel,aiming at poor geological stability, complex engineering environment and the higher control requirements of subsidence in water-rich sandy gravel stratum of Beijing,which controlled the deformation of engineering structure,surrounding buildings along and underground pipeline effectively and ensured the safety of surrounding environment.

关键词

砂卵石地层 / 大断面 / CRD法 / 洞桩法 / 隧道施工

Keywords

sandy gravel stratum / large section / CRD method / hole pile / tunnel construction