锚碇沉井基础施工期安全监控技术

冯兆祥()1、王锦国2、王建2

中国工程科学 ›› 2010, Vol. 12 ›› Issue (4) : 68-72.

PDF(771 KB)
PDF(771 KB)
中国工程科学 ›› 2010, Vol. 12 ›› Issue (4) : 68-72.

锚碇沉井基础施工期安全监控技术

  • 冯兆祥()1、王锦国2、王建2

作者信息 +

Security monitoring technology of the caisson foundation of anchorage in construction

  • Feng Zhaoxiang1、Wang Jinguo2、Wang Jian2

Author information +
History +

摘要

针对泰州大桥南锚沉井基础的结构特点和施工方法,设计了施工安全监控方案。施工期监测成果分析表明:沉井下沉初期沉井底部刃脚附近水平方向的拉应力较大,将此项物理量作为下沉的控制指标,有效指导了沉井施工;侧壁土压力分布随入土深度呈先增加后减小规律。

Abstract

Aiming at the structure features and construction methods for the south anchor caisson foundation of Taizhou Yangtze Highway Bridge, this paper presents a design scheme of security monitoring in construction. The result from monitoring data in construction shows that the horizontal tension stress which near blade foot at the bottom of well are greater in initial well sinking. It will effectively guide the well construction with the physical quantity as the control index of well sinking. Sidewall earth pressure increases first, and then decreases with the increase of embedment depth.

关键词

沉井 / 控制指标 / 下沉 / 侧壁土压力

Keywords

caisson / control index / well sinking / sidewall earth pressure

引用本文

导出引用
冯兆祥,王锦国,王建. 锚碇沉井基础施工期安全监控技术. 中国工程科学. 2010, 12(4): 68-72

参考文献

基金
国家科技支撑计划资助项目 (2009BAG15B02);江苏省“333高层次人才培养工程”专项资助项目
PDF(771 KB)

Accesses

Citation

Detail

段落导航
相关文章

/