西堠门大桥北边跨锚侧钢箱梁安装技术
Erection technique of steel box-girder at anchor-side of north side span in Xihoumen suspension bridge
Lu Wei1、Deng Hengchang1、Zhang SHengli2、Yang Ming1、Yu Yeqiang1、Li Pingli3、Li Runzhe1、Xiao Anbin1
西堠门大桥为国内最长的两跨连续跨海钢箱梁悬索桥,桥址处恶劣的自然环境,使得大桥北边跨锚侧钢箱梁安装面临诸多难题,文中介绍了该位置钢箱梁安装与线形调整关键技术与施工工艺。
Xihoumen Bridge is the longest two-span continuous steel box girder suspension bridge in China. Several problems have been encountered due to severe natural environment during the erection of steel box girder at anchor-side of north side span of the bridge. The key technique and construction process of erection and linetype adjustment for the steel box girder are introduced.
悬索桥 / 钢箱梁 / 西堠门大桥 / 北边跨锚侧 / 安装与线形调整 / 关键技术
suspension bridge / steel box-girder / Xihoumen Bridge / anchor-side of north side span / erection and adjustment of linetype / key technique
/
〈 |
|
〉 |