浅埋大跨黄土隧道管棚受力机制分析

李健1、谭忠盛1、喻渝()2、倪鲁肃1

中国工程科学 ›› 2011, Vol. 13 ›› Issue (9) : 92-96.

PDF(683 KB)
PDF(683 KB)
中国工程科学 ›› 2011, Vol. 13 ›› Issue (9) : 92-96.

浅埋大跨黄土隧道管棚受力机制分析

  • 李健1、谭忠盛1、喻渝()2、倪鲁肃1

作者信息 +

Analysis of mechanical behaviors of big pipe-roof for shallow buried large-span tunnel

  • Li Jian1、Tan Zhongsheng1、Yu Yu2、Ni Lusu1

Author information +
History +

摘要

以郑西客运专线阌乡隧道为依托工程,进行浅埋大跨黄土隧道长大管棚受力机制的研究。对隧道进入下穿高速公路前的管棚纵向变形进行现场监测,根据测试结果分析管棚在隧道开挖过程中的受力特性,得到浅埋黄土隧道长大管棚受力变形规律:掌子面前方约15 m处管棚开始受力,掌子面过后约15 m管棚的受力趋于稳定,管棚的纵向变形总体上呈凹槽形分布,掌子面处管棚受力最大。通过有限差分程序FLAC3D计算不同管棚参数条件下的施工方案,为隧道下穿段管棚工法及施工方案的优化设计提供理论依据,并在下穿段沉降监测中得到验证。

Abstract

A series of research on mechanical behaviors of big pipe-roof in shallow large-span loess tunnel was made on Wenxiang Tunnel in Zhengzhou-Xi'an Special Passenger Railway. The longitudinal deformations of the pipe-roofs are monitored and the mechanical behaviors of the pipe-roofs are researched at the test section. The force-deformation law of big pipe roof in loess tunnel was obtained: in front of the excavating face about 15 m, the pipe roof started to bear the load; after the excavating face about 15 m,the load became stable; the longitudinal deformation of the whole pipe-roofs was groove-shaped distribution; the largest force of pipe-roofs was at the excavating face. The conclusions can provide reference for the design parameter optimization and the construction scheme selection of pipe-roofs and had been verified in the result of numerical analysis software FLAC3D and deformation monitoring.

关键词

浅埋暗挖 / 下穿施工 / 黄土隧道 / 管棚 / 变形监测 / 受力机制

Keywords

shallow burying mining / undercrossing construction / loess tunnel / pipe-roof / deformation monitoring / mechanical behavior

引用本文

导出引用
李健,谭忠盛,喻渝,倪鲁肃. 浅埋大跨黄土隧道管棚受力机制分析. 中国工程科学. 2011, 13(9): 92-96

参考文献

基金
铁道部重大科技研发计划资助项目(2005K001-D(G)-2)
PDF(683 KB)

Accesses

Citation

Detail

段落导航
相关文章

/