DX桩与后压浆钻孔灌注桩现场试验研究

刘春刚()1、柴小兵1、欧阳义1、贺德新2

中国工程科学 ›› 2012, Vol. 14 ›› Issue (1) : 80-85.

PDF(2872 KB)
PDF(2872 KB)
中国工程科学 ›› 2012, Vol. 14 ›› Issue (1) : 80-85.

DX桩与后压浆钻孔灌注桩现场试验研究

  • 刘春刚()1、柴小兵1、欧阳义1、贺德新2

作者信息 +

Study of in situ test to DX pile and post grouting bored pile

  • Liu Chungang1、Chai Xiaobing1、Ouyang Yi1、He Dexin2

Author information +
History +

摘要

对DX桩进行了现场竖向抗压静载试验,并与后压浆直孔灌注桩进行了比较。结果表明,DX桩和后压浆钻孔灌注桩都可以提高桩的承载力和控制桩的沉降,4根试验桩的试验效果相差不大,但DX桩能以桩径小、桩长短满足大承载力的桩基,达到极限承载力时,混凝土的单方承载力是后压浆钻孔灌注桩的1.5倍,可以减少工程材料,降低工程造价;且DX桩施工工艺更简单,能加快施工进度。

Abstract

The in-situ vertical resisting compression static test of DX pile is made and it is compared with post-grouting bored pile. The results indicate that DX pile and post-grouting bored pile can enhance capacity and control settlement effectively;effect of four test piles is not quite different, but the DX pile is of smaller diameter and shorter length which can meet large capacity; its concrete bearing capacity of per cubic meter is 1.5 times larger than that of post-grouting bored pile; DX pile can reduce engineering materials to lower project cost and speed up the construction progress.

关键词

DX桩 / 静载荷试验 / 承载力 / 沉降

Keywords

DX pile / static load test / bearing capacity / settlement

引用本文

导出引用
刘春刚,柴小兵,欧阳义,贺德新. DX桩与后压浆钻孔灌注桩现场试验研究. 中国工程科学. 2012, 14(1): 80-85

参考文献

基金
铁道部重点科技项目(2009J010-F)