DX桩与后压浆钻孔灌注桩现场试验研究
Study of in situ test to DX pile and post grouting bored pile
Liu Chungang1、Chai Xiaobing1、Ouyang Yi1、He Dexin2
对DX桩进行了现场竖向抗压静载试验,并与后压浆直孔灌注桩进行了比较。结果表明,DX桩和后压浆钻孔灌注桩都可以提高桩的承载力和控制桩的沉降,4根试验桩的试验效果相差不大,但DX桩能以桩径小、桩长短满足大承载力的桩基,达到极限承载力时,混凝土的单方承载力是后压浆钻孔灌注桩的1.5倍,可以减少工程材料,降低工程造价;且DX桩施工工艺更简单,能加快施工进度。
The in-situ vertical resisting compression static test of DX pile is made and it is compared with post-grouting bored pile. The results indicate that DX pile and post-grouting bored pile can enhance capacity and control settlement effectively;effect of four test piles is not quite different, but the DX pile is of smaller diameter and shorter length which can meet large capacity; its concrete bearing capacity of per cubic meter is 1.5 times larger than that of post-grouting bored pile; DX pile can reduce engineering materials to lower project cost and speed up the construction progress.
DX pile / static load test / bearing capacity / settlement
/
〈 |
|
〉 |