泰州大桥主梁施工阶段的颤振稳定性及管理对策

李承宬、陈艾荣()、马如进

中国工程科学 ›› 2012, Vol. 14 ›› Issue (5) : 46-50.

PDF(1216 KB)
PDF(1216 KB)
中国工程科学 ›› 2012, Vol. 14 ›› Issue (5) : 46-50.

泰州大桥主梁施工阶段的颤振稳定性及管理对策

  • 李承宬、陈艾荣()、马如进

作者信息 +

Flutter stability and management strategy for the deck of Taizhou Bridge during construction stage

  • Li Chengcheng、Chen Airong、Ma Rujin

Author information +
History +

摘要

以三塔两跨的泰州大桥为研究对象,根据有限元分析及全桥气弹模型风洞试验的结果,对主梁对称架设施工阶段的动力特性及颤振稳定性进行了研究。结合桥位地区30年的月极大风速分析,对主梁架设阶段的颤振稳定性进行了评价。最后提出了一套针对悬索桥施工阶段颤振稳定性评价及策略确定的流程,可供其他桥梁参考。

Abstract

In this paper, Taizhou Bridge, a three-tower suspension bridge was investigated to discover the flutter stability of deck under symmetrical construction through FEM(finite element method) analysis and full aeroelastic model tests. The assessment of flutter stability during deck construction stage was performed based on analysis of the monthly maximum wind speed in the past 30 years. In the end, the assessment and management strategy of flutter stability were proposed, which can be referred for other bridges.

关键词

多塔悬索桥 / 施工阶段 / 颤振稳定性 / 管理对策

Keywords

multi tower suspension bridge / construction stage / flutter stability / management strategy

引用本文

导出引用
李承宬,陈艾荣,马如进. 泰州大桥主梁施工阶段的颤振稳定性及管理对策. 中国工程科学. 2012, 14(5): 46-50

参考文献

基金
国家科技支撑计划资助项目(2009BAGl5B01); 交通行业联合科技攻关项目(2008-353-332-190)
PDF(1216 KB)

Accesses

Citation

Detail

段落导航
相关文章

/