三峡升船机塔柱施工期变形监测

邱章云()、罗琛

中国工程科学 ›› 2013, Vol. 15 ›› Issue (9) : 102-107.

PDF(1228 KB)
PDF(1228 KB)
中国工程科学 ›› 2013, Vol. 15 ›› Issue (9) : 102-107.

三峡升船机塔柱施工期变形监测

  • 邱章云()、罗琛

作者信息 +

Deformation monitoring on Three Gorges Project ship lift tower during construction period

  • Qiu Zhangyun、Luo Chen

Author information +
History +

摘要

从控制监测过程中的内部、外部要素以及现场作业条件着手,通过对几种典型监测方法精度分析及360°反射棱镜试验研究,最终选择全站仪极坐标法作为三峡升船机塔柱施工期变形监测的方法,并对运用该方法得到的长期监测数据成果进行了变形规律分析。分析结果表明:塔柱变形受温度影响大,温差越大,变形越大,温差小或恒温状态时变形很小甚至没有变形。

Abstract

This paper begins with internal and external factors as well as field operating conditions during the monitoring process. According to the accuracy analysis which is done to several typical monitoring methods and the study which is done to the 360° reflecting prism test, the final choice is that total station polar coordinate would be used as the deformation monitoring method of Three Gorges Project ship lift tower during construction period, and deformation analysis is received using the long-term monitoring data obtained by the use of the method. The results show that tower deformation is greatly affected by temperature; the greater the temperature difference, the greater the deformation. It would be small deformation or even no deformation when temperature difference is small or under constant temperature.

关键词

三峡升船机 / 塔柱 / 变形监测 / 全站仪极坐标法

Keywords

Three Gorges Project ship lift / tower column / deformation monitoring / total station polar coordinate

引用本文

导出引用
邱章云,罗琛. 三峡升船机塔柱施工期变形监测. 中国工程科学. 2013, 15(9): 102-107

参考文献

PDF(1228 KB)

Accesses

Citation

Detail

段落导航
相关文章

/