国产首架大型客机研制项目的风险管理研究

邱菀华()

中国工程科学 ›› 2014, Vol. 16 ›› Issue (10) : 31-38.

PDF(2209 KB)
PDF(2209 KB)
中国工程科学 ›› 2014, Vol. 16 ›› Issue (10) : 31-38.

国产首架大型客机研制项目的风险管理研究

  • 邱菀华()

作者信息 +

Risk management of the projecton the first large passenger plane

  • Qiu Wanhua

Author information +
History +

摘要

解决国产首架大型客机研制工程项目风险管理诸多国际性难题,提出三维风险管理、熵风险评价原理和方法,攻克大型客机研制项目组织、进度五个领域全寿命期风险管理的系列关键问题,创建了与全球配置接轨的、大型工程跨国研制的风险管理模式,以及群集成管理全量表操作实施体系(英APM-BOKV4.0),建立一体化信息风险管理平台以实现全寿命期风险管理协同效应优化,确保低风险、优质高效地实现建设目标。

Abstract

Put forward three-dimensional risk management method and entropy-risk assessment, solve many difficult international problems on the develop project on the first large passenger plane. Solve the key problems of life-cycle risk management on organization, schedule and so on. Create risk management model of large-scale project on transnational development which integration into the global allocation, and operational system of integrated management of cluster (APM-BOK V4.0). To accomplish the project with low risk and high quality efficiency, building a management platform of information risk integration.

关键词

大型工程项目管理 / 风险管理 / 熵-优化 / 项目群管理

Keywords

large-scale projects management / risk management / entropy–optimization / project cluster management