Development of network schedule standardization system in hydraulic and hydropower engineering

Wang Renchao,Pan Feifei,Li Shiqi,Chen Jianyou

Strategic Study of CAE ›› 2015, Vol. 17 ›› Issue (1) : 129 -136.

PDF (6059KB)
Strategic Study of CAE ›› 2015, Vol. 17 ›› Issue (1) : 129 -136.

Development of network schedule standardization system in hydraulic and hydropower engineering

Author information +
History +
PDF (6059KB)

Abstract

Network schedule is an important part in construction organization and design in hydraulic and hydropower engineering. As most network schedule software provided limited functionality in schedule generation and analysis, leading to network schedule generation is time-consuming, laborious, inefficient, and low degree of standardization. Based on analysis of connotation of network standardization in hydraulic and hydropower engineering, this paper discussed the basic content of the network schedule standardization, developed the standardization system of network schedule in hydraulic and hydropower engineering, and introduced functions as network schedule aided generation, analysis, evaluation and review, as well as the output of results in detail. The system interface is friendly and intuitive visualization, and provides powerful computing and optimization capabilities, greatly improving the efficiency and quality of the preparation of the network schedule to engineering staffs, and provides a new way and means in quickly generating, analyzing and optimizing the network schedule.

Keywords

hydraulic and hydropower engineering / network schedule / standardization / SHAPS

Cite this article

Download citation ▾
Wang Renchao,Pan Feifei,Li Shiqi,Chen Jianyou. Development of network schedule standardization system in hydraulic and hydropower engineering. Strategic Study of CAE, 2015, 17(1): 129-136 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (6059KB)

291

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/