The key technology of testing and commissioning of high-speed railway and the main testing achievements

Kang Xiong and Yao Jianwei

Strategic Study of CAE ›› 2015, Vol. 17 ›› Issue (4) : 21 -29.

PDF (4431KB)
Strategic Study of CAE ›› 2015, Vol. 17 ›› Issue (4) : 21 -29.

The key technology of testing and commissioning of high-speed railway and the main testing achievements

Author information +
History +
PDF (4431KB)

Abstract

The connotation and necessity of testing and commissioning of high-speed railway is explained and discussed, combined with the engineering practice of testing and commissioning in China, the key technology of testing and commissioning of high-speed railway are analyzed from the perspective of wheel/rail interaction, pantograph and ocs relation, aerodynamics of high-speed railway and train-track-bridge coupling. Then the main achievements of testing and commissioning of high-speed railway in China are concluded, and some useful suggestions are given about high-speed railway construction and operation.

Keywords

high-speed railway / system test / testing and commissioning / wheel/rail interaction / pantograph and ocs relation / train-track-bridge / aerodynamics of high-speed railway

Cite this article

Download citation ▾
Kang Xiong and Yao Jianwei. The key technology of testing and commissioning of high-speed railway and the main testing achievements. Strategic Study of CAE, 2015, 17(4): 21-29 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (4431KB)

321

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/