Key technologies of precision demolition blasting of ultra-long urban viaduct in complicated surroundings

Xie Xianqi,Jia Yongsheng,Yao Yingkang,Sun Jinshan,Wu Xinxia,Liu Changbang

Strategic Study of CAE ›› 2014, Vol. 16 ›› Issue (11) : 65 -71.

PDF (2776KB)
Strategic Study of CAE ›› 2014, Vol. 16 ›› Issue (11) : 65 -71.

Key technologies of precision demolition blasting of ultra-long urban viaduct in complicated surroundings

Author information +
History +
PDF (2776KB)

Abstract

Key technologies of precision blasting were put forward based on characteristics of urban viaduct blasting demolition in complicated surroundings. Initial bending instability mechanics model of reinforcing steel bar frame of blasting fragmented pier and sequenced collapsed dynamics model were established for quantitative blasting design. Technologies of water pressure blasting were applied in multi-cell box girder fragmentation. The initiation network of non-electric duplication crossover was adopted for safety and reliability of ultra-long delay. The rationality of blasting scheme and parameters were validated by physical model test. Adverse effects were forecasted and controlled by integrated protective technologies. Specialization cooperation,precision,execution(SCPE)project management method was put forward for precision management. Key technologies of precision demolition blasting can provide reference for similar projects.

Keywords

viaduct / blasting demolition / precision blasting / instability model / initiation network / adverse effects control

Cite this article

Download citation ▾
Xie Xianqi,Jia Yongsheng,Yao Yingkang,Sun Jinshan,Wu Xinxia,Liu Changbang. Key technologies of precision demolition blasting of ultra-long urban viaduct in complicated surroundings. Strategic Study of CAE, 2014, 16(11): 65-71 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2776KB)

283

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/