Make full use of the dredged soil for speeding up reclamation of Hengsha east shoal

Zhou Hai,Tang Chen,Ji Lan

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (6) : 30 -34.

PDF (1311KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (6) : 30 -34.

Make full use of the dredged soil for speeding up reclamation of Hengsha east shoal

Author information +
History +
PDF (1311KB)

Abstract

According to Hengsha east shoal reclamation projects implementation, combined with the Yangtze estuary harbors and channels dredged soil disposal condition, this paper analyses the main problems of using the Yangtze estuary dredged soil to Hengsha east shoal reclamation. According to Hengsha ocean metro construction planning, it calculates reclamation scale and soil demand, and proposes the implementation principles and scheme of using the Yangtze estuary dredged soil for speeding up Hengsha east shoal reclamation, and gives some helpful suggestions.

Keywords

Yangtze estuary / dredged soil resources / Hengsha east shoal / speeding up reclamation

Cite this article

Download citation ▾
Zhou Hai,Tang Chen,Ji Lan. Make full use of the dredged soil for speeding up reclamation of Hengsha east shoal. Strategic Study of CAE, 2013, 15(6): 30-34 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1311KB)

328

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/