North anchorage project construction key technology in the Fourth Nanjing Yangtze River Bridge

Wang Chengjiang,Niu Yazhou,Tian Xin,Jing Gangyi

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (8) : 31 -36.

PDF (1993KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (8) : 31 -36.

North anchorage project construction key technology in the Fourth Nanjing Yangtze River Bridge

Author information +
History +
PDF (1993KB)

Abstract

North anchorage of the Fourth Nanjing Yangtze River Bridge is a kind of gravity anchor. Distributed mortise-tenon anchor system of Reinforced Concrete is designed for its anchor system structure first time in China. Thermal stress and temperature control is the key technique in large mass concrete construction of this anchorage. This article will introduce large mass concrete temperature control method,anchor system fixing technology and high-accuracy survey technology of North anchorage of the Fourth Nanjing Yangtze River Bridge.

Keywords

anchorage / large-mass-concrete / temperature control / anchor system

Cite this article

Download citation ▾
Wang Chengjiang,Niu Yazhou,Tian Xin,Jing Gangyi. North anchorage project construction key technology in the Fourth Nanjing Yangtze River Bridge. Strategic Study of CAE, 2013, 15(8): 31-36 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1993KB)

210

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/