Innovation and practice of construction technology on hydraulic high-precision concrete

Zhou Hougui

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (9) : 4 -8.

PDF (848KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (9) : 4 -8.

Innovation and practice of construction technology on hydraulic high-precision concrete

Author information +
History +
PDF (848KB)

Abstract

Based on the background of high-precision concrete construction in Three Gorges Project ship lift, the meaning of hydraulic high-precision concrete and its construction techniques and construction practices are expounded in this paper. The main accuracy control standards, high-precision measurement technology, high-precision concrete construction technology and concrete physical test results of the high-precision concrete construction of the Three Gorges Project ship lift are introduced in details.

Keywords

high-precision concrete / construction technology / Three Gorges Project / ship lift

Cite this article

Download citation ▾
Zhou Hougui. Innovation and practice of construction technology on hydraulic high-precision concrete. Strategic Study of CAE, 2013, 15(9): 4-8 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (848KB)

281

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/