Analysis and control of hydration heat of cast-in-place diaphragm of segmental precast box girder

Chen Yang,Zhong Yao,Zheng Kaiqi,Shen Bin,Meng Shaoping

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (8) : 99 -103.

PDF (1445KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (8) : 99 -103.

Analysis and control of hydration heat of cast-in-place diaphragm of segmental precast box girder

Author information +
History +
PDF (1445KB)

Abstract

For the pier segment of the segmental precast bridge, the diaphragm is often casted in place to reduce the lifting weight. Considering the volume of the diaphragm, it belongs to massive concrete,in which concrete hydration heat may cause excessive tensile stress in some parts. Without right control measures often lead to cracking of the precast segments during the construction phase. Based on three-dimensional transient temperature field theory, numerical simulation with ANSYS was performed, to investigate the distribution law of hydration heat temperature and stress. The analysis shows that, the tensile stress at the outside of the webs is sufficient to lead to concrete cracking, longitudinal micro-cracks along the webs is also observed during the hydration heat test. With the distribution of temperature and stress obtained from numerical simulation, a series of control measures were proposed and adopted to the Fourth Nanjing Yangtze River Bridge approach project, which were proved to be feasible and effective.

Keywords

concrete box girder / hydration heat / temperature field / stress field / cracks

Cite this article

Download citation ▾
Chen Yang,Zhong Yao,Zheng Kaiqi,Shen Bin,Meng Shaoping. Analysis and control of hydration heat of cast-in-place diaphragm of segmental precast box girder. Strategic Study of CAE, 2013, 15(8): 99-103 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1445KB)

225

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/