Structural design and construction of catway for the Fourth Nanjing Yangtze River Bridge

Luan Changhua, Shen Bin

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (8) : 48 -53.

PDF (2103KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (8) : 48 -53.

Structural design and construction of catway for the Fourth Nanjing Yangtze River Bridge

Author information +
History +
PDF (2103KB)

Abstract

The Fourth Nanjing Yangtze River Bridge is a two-tower, three-span suspension bridge with the main span of 1 418 m, where in the catway with no wind cable and no vibration suppression mechanism for construction of the superstructure is a three-span continuous catway system. Structural design, erection, adjustment and demolition of the catway are systematically described in detail in this paper, which could provide great reference for catway structural design and construction of similar suspension bridges.

Keywords

the Fourth Nanjing Yangtze River Bridge / catway structural design / catway erection / catway adjustment / catway demolition

Cite this article

Download citation ▾
Luan Changhua, Shen Bin. Structural design and construction of catway for the Fourth Nanjing Yangtze River Bridge. Strategic Study of CAE, 2013, 15(8): 48-53 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2103KB)

254

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/