The analysis of specific energy applied in Bohai Strait tunnel during TBM construction

Gao Pan,Zou Chong

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (12) : 73 -79.

PDF (2714KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (12) : 73 -79.

The analysis of specific energy applied in Bohai Strait tunnel during TBM construction

Author information +
History +
PDF (2714KB)

Abstract

The proposed Bohai Strait tunnel is a challenging project, and penetration rate of tunnel boring machine (TBM) is one of the keys. This paper made a contrast between the Clem Jones tunnel in Australia and the Bohai Strait tunnel,and introduced the specific energy used in the Clem Jones tunnel. During the construction of the Clem Jones tunnel, researchers made the analysis and forecasted about the TBM's penetration rate using the specific energy, which was identical to the practical construction very well. This paper concluded that the specific energy can be used in the Bohai Strait tunnel as well as the Clem Jones tunnel,which was based on the comparative analysis of the Clem Jones tunnel and Bohai Strait tunnel.

Keywords

TBM / specific energy / drilling rate index / penetration rate

Cite this article

Download citation ▾
Gao Pan,Zou Chong. The analysis of specific energy applied in Bohai Strait tunnel during TBM construction. Strategic Study of CAE, 2013, 15(12): 73-79 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2714KB)

278

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/