Risk assessment on Bohai Bay subsea tunnel in its operational period

Wang Yonghong,Liu Bing,Zhang Yonggang

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (12) : 107 -112.

PDF (1602KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (12) : 107 -112.

Risk assessment on Bohai Bay subsea tunnel in its operational period

Author information +
History +
PDF (1602KB)

Abstract

The operation of super-long subsea tunnel is a extremly complex system project,has larger uncertainty and safety risk. The procedure of risk assessment was explained in detail,and its application on Bohai Bay subsea tunnel project was proposed as a case study in this paper. Firstly, lots of different risk factors of the subsea tunnel operation were identified systematically, which involved water damage,tunnel lining crack, tunnel freezing,tunnel lining corrosion,tunnel earthquake disaster,the air pollution inside the cave,tunnel fire and the train derailment accident. Then,those operational risks were analyzed and assessed by the confidence index method and analytic hierarchy process, and were classified and discussed gradually according to the risk acceptance criterion. Finally,some topics about risk assessment on the subsea tunnel operational risk needed to the further research were high-lighted here.

Keywords

subsea tunnel / operational period / risk analysis / risk assessment

Cite this article

Download citation ▾
Wang Yonghong,Liu Bing,Zhang Yonggang. Risk assessment on Bohai Bay subsea tunnel in its operational period. Strategic Study of CAE, 2013, 15(12): 107-112 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1602KB)

311

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/