Study on overall lifting program for steel box girder of large span of three-span continuous suspension bridge

Yao Qingtao,Pan Guilin,Yao Qingtao,He Chaoran

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (8) : 54 -59.

PDF (1643KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (8) : 54 -59.

Study on overall lifting program for steel box girder of large span of three-span continuous suspension bridge

Author information +
History +
PDF (1643KB)

Abstract

Unlike single-span suspension bridge,the three -span continuous suspension bridge is mainly characterized by slings set in both side spans, and the continuous transition of stiffening girders between the mid and side spans achieved by girders without slings in the main tower region, and usually restraint equipments set on the side span transition piers to achieve the coordinated deformation between the main cables and stiffening girders in the region, so the lifting method and key construction process for the stiffening girders of the type of suspension bridge is relatively complex. the Fourth Nanjing Yangtze River Bridge as the background, and according to the structural features of the large span three-span continuous suspension bridge, the reasonable lifting program is determined through the comparison and analysis on two different types of lifting sequence for steel box girders.

Keywords

three-span continuous suspension bridge / steel box girder / lifting program / closure / saddle pushing

Cite this article

Download citation ▾
Yao Qingtao,Pan Guilin,Yao Qingtao,He Chaoran. Study on overall lifting program for steel box girder of large span of three-span continuous suspension bridge. Strategic Study of CAE, 2013, 15(8): 54-59 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1643KB)

308

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/