Determination of lifting sequence of steel box girders of suspension main bridge of Taizhou Bridge

Wang Jun and Liang Jinda

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 41 -45.

PDF (1166KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 41 -45.

Determination of lifting sequence of steel box girders of suspension main bridge of Taizhou Bridge

Author information +
History +
PDF (1166KB)

Abstract

Taizhou Bridge is the first three-tower two-span suspension bridge with spans over 1 000 m in the world. Its main spans are 2×1 080 m; the middle tower is a steel frame with longitudinal herringbone shape and lateral gate shape; the side towers are gate shaped concrete frames; the stiff girder consists of flat streamline steel box girders, with a total of 136 steel box girders of about 33 426 t for the whole bridge. This article determines the proper lifting sequence of steel box girders of this threetower suspension bridge by analyzing the effect of steel box girders lifting sequence on structural system and difficulty in construction .

Keywords

three tower two pan suspension bridge / steel box girder / lifting sequence

Cite this article

Download citation ▾
Wang Jun and Liang Jinda. Determination of lifting sequence of steel box girders of suspension main bridge of Taizhou Bridge. Strategic Study of CAE, 2012, 14(5): 41-45 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1166KB)

253

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/