Research on analysis method of suspension bridge based on ANSYS

Xie Xuefeng and Luo Xiheng

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 101 -105.

PDF (922KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 101 -105.

Research on analysis method of suspension bridge based on ANSYS

Author information +
History +
PDF (922KB)

Abstract

Special programs and general programs applied to suspension bridge analysis have their limitations. This paper focuses on ANSYS-secondary-development and makes it possible to analyze suspension bridges both with accuracy of special programs and convenience of general programs. This paper is dedicated to saddle simulation,incremental launching realization and how to obtain unstressed length of main cable and slings and how to keep it unchanged. In the end, the method is verified through finite element model in Runyang Yangtze River Bridge.

Keywords

suspension bridge / ANSYS-secondary-development / saddle / incremental launching / unstressed length / iteration

Cite this article

Download citation ▾
Xie Xuefeng and Luo Xiheng. Research on analysis method of suspension bridge based on ANSYS. Strategic Study of CAE, 2012, 14(5): 101-105 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (922KB)

323

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/