Research of steel box girder dehumidification in Taizhou Bridge

Li Lin and Xu Jun

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 10 -13.

PDF (939KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 10 -13.

Research of steel box girder dehumidification in Taizhou Bridge

Author information +
History +
PDF (939KB)

Abstract

The steel box girder of Taizhou Bridge is 2 160 m long with volume of about 240 thousand m3. The paper analyzes the principle, lectotype, setting, workflow and construction of the steel box girder dehumidification. And the paper protocols the quality inspection and evaluation standards of the steel box girder dehumidification in Taizhou Bridge. It proposes reference for similar project.

Keywords

Taizhou Bridge / steel box girder / dehumidification / research

Cite this article

Download citation ▾
Li Lin and Xu Jun. Research of steel box girder dehumidification in Taizhou Bridge. Strategic Study of CAE, 2012, 14(5): 10-13 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (939KB)

280

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/