Technology of freezing reinforcement and risk control at all direction in construction of break in and break out of shield

Ji Peng

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (2) : 90 -95.

PDF (4791KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (2) : 90 -95.

Technology of freezing reinforcement and risk control at all direction in construction of break in and break out of shield

Author information +
History +
PDF (4791KB)

Abstract

The construction of break-in and break-out of shield in the complicated condition of aquiferous geology, by the method of horizontal freezing, is to extend or deepen the frozen thickness outside the horizontal freezing ring which encircle the shield at all directions and prevent from water leaking and sand pouring effectively. The problem of long-distance drilling in the finished end well is solved easily by a longdistance horizontal drilling and anti-extrusion connector. It has proved that the technology of freezing reinforcement and risk control at all direction, in the construction of break-in and break-out of shield in the complicated condition of aquiferous geology is reliable, easy and will have great value to be spread in the risk control of construction of break-in and break-out.

Keywords

the complicated condition of aquiferous geology / break in and break out of shield / at all direction / risk control / freezing reinforcement

Cite this article

Download citation ▾
Ji Peng. Technology of freezing reinforcement and risk control at all direction in construction of break in and break out of shield. Strategic Study of CAE, 2012, 14(2): 90-95 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (4791KB)

371

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/