Taking the construction of the main shaft hoisting in Longgu 1# Coal Mine for example, the organizational characteristics of the well shaft tower and equipments, elevator and other parallel operation of installation construction were introduced, and the technologies of tower shaft slipform construction, six-disc hanging plate installation and permanent elevator installation were described. The paper can provide reference for the similar type of the construction.

Keywords

parallel operations / well tower sliding / shaft equipment / elevator installation / construction technology

Cite this article

Download citation ▾
Yang Yiming,Huang Jiapin,Shen Xihua,Cao Yueqin and Ma Zhimin. Construction technology of well shaft tower construction engineering. Strategic Study of CAE, 2012, 14(2): 85-89 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (3704KB)

592

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/