Construction of in-hospital neutron irradiator

Li Yiguo,Xia Pu,Peng Dan,Zou Shuyun,Wu Xiaobo,Zhang Jinhua,Zhang Yongbao,Zhang Zizhu,Liu Tong,Zhou Yongmao

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (8) : 17 -19.

PDF (952KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (8) : 17 -19.

Construction of in-hospital neutron irradiator

Author information +
History +
PDF (952KB)

Abstract

The construction of in-hospital neutron irradiator (IHNI) started in 2007. Its building construction was completed in Dec. 2008, and the installation and test of the relevant systems were completed in Mar. 2009. The first criticality was achieved on Dec. 7, 2010. The reactor reached the full power on Jan. 22, 2010. The test results show that the final excess reactivity is 4.2 mk; the maximum continuous operation time at full power is 12 h and the power wave is less then 0.3 % during full power operation; when the positive reactivity with 4.2 mk is inserted into the reactor suddenly, the power will be increased to 85.7 kW at the time of 229 s, and then, it will turn to the normal value due to the negative temperature effect.The release result of reactivity shows the inherent safety of reactor.

Keywords

in-hospital neutron irradiator(INHI) / commissioning / startup

Cite this article

Download citation ▾
Li Yiguo,Xia Pu,Peng Dan,Zou Shuyun,Wu Xiaobo,Zhang Jinhua,Zhang Yongbao,Zhang Zizhu,Liu Tong,Zhou Yongmao. Construction of in-hospital neutron irradiator. Strategic Study of CAE, 2012, 14(8): 17-19 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (952KB)

248

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/