Study of in situ test to DX pile and post grouting bored pile

Liu Chungang,Chai Xiaobing,Ouyang Yi,He Dexin

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (1) : 80 -85.

PDF (2872KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (1) : 80 -85.

Study of in situ test to DX pile and post grouting bored pile

Author information +
History +
PDF (2872KB)

Abstract

The in-situ vertical resisting compression static test of DX pile is made and it is compared with post-grouting bored pile. The results indicate that DX pile and post-grouting bored pile can enhance capacity and control settlement effectively;effect of four test piles is not quite different, but the DX pile is of smaller diameter and shorter length which can meet large capacity; its concrete bearing capacity of per cubic meter is 1.5 times larger than that of post-grouting bored pile; DX pile can reduce engineering materials to lower project cost and speed up the construction progress.

Keywords

DX pile / static load test / bearing capacity / settlement

Cite this article

Download citation ▾
Liu Chungang,Chai Xiaobing,Ouyang Yi,He Dexin. Study of in situ test to DX pile and post grouting bored pile. Strategic Study of CAE, 2012, 14(1): 80-85 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (2872KB)

26

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/