Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel

Guo Xiaohong,Wang Mengshu

Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (9) : 38 -41.

PDF (1272KB)
Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (9) : 38 -41.

Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel

Author information +
History +
PDF (1272KB)

Abstract

Focusing on F1 weathered trough which has maximum water inflow and great difficulty in construction in Xiamen Xiang'an Subsea Tunnel,full-sectional grouting reinforcement and waterproofing,5 m grouting inside heading, 70 m along longitudinal direction of tunnel and superfine cement single-fluid grouting as major grouting material were applied according to poor geological conditions and the character of sudden water inflow. Meanwhile,the corresponding parameters of grouting were established after drillings for grouting were conducted. The results of field monitoring and numerical calculation during construction show that the grouting-effect meets the qualifications of design and construction of Xiamen Xiang'an Subsea Tunnel. The research results can provide technical reference for similar projects in grouting and waterproofing.

Keywords

Ximen Xiang’an Subsea Tunnel / grouting reinforcement / stability / numerical simulation

Cite this article

Download citation ▾
Guo Xiaohong,Wang Mengshu. Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel. Strategic Study of CAE, 2011, 13(9): 38-41 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1272KB)

51

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/