Disaster reduction project management on barrier risk eliminating and emergency dredging of Bailong River in Zhouqu County and the cognizance

Liu Ning

Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (1) : 25 -30.

PDF (856KB)
Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (1) : 25 -30.

Disaster reduction project management on barrier risk eliminating and emergency dredging of Bailong River in Zhouqu County and the cognizance

Author information +
History +
PDF (856KB)

Abstract

This paper briefly introduced the barrier risk eliminating and emergency dredging of Bailong River in Zhouqu County, including the scheme compilation and perfecting, and the key aspects and actual considering etc. Based on the target decision-making, systemization and dynamics, the important meaning and effect of the disaster reduction project management in handling natural disasters and risk eliminating succor were analyzed, and the methods for improving the capacity of scientific disaster reduction were also discussed.

Keywords

Zhouqu mudslides / risk eliminating of barrier lake / emergency dredging / disaster reduction project management

Cite this article

Download citation ▾
Liu Ning. Disaster reduction project management on barrier risk eliminating and emergency dredging of Bailong River in Zhouqu County and the cognizance. Strategic Study of CAE, 2011, 13(1): 25-30 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (856KB)

269

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/