The construction design and practice of Three Gorges Project

Wen Yonghong,Xie Xiangrong,Fan Wuyi

Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (7) : 111 -116.

PDF (679KB)
Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (7) : 111 -116.

The construction design and practice of Three Gorges Project

Author information +
History +
PDF (679KB)

Abstract

The construction of Three Gorges Project (TGP) is characterized by large construction scale, high construction intensity and complexity in technology. In view of various technical difficulties such as navigation in construction period,Changjiang river closures, high intensity concrete and earth rock construction,roller compacted concrete (RCC) cofferdam in 3-stage III and double line five step ship lock,the general arrangement of the project construction is as follows:construction in 3-stage,navigation with diversion channel and power generation under cofferdam project.The practice and innovation achievements in river diversion during construction as well as earth rock and concrete construction were presented emphatically.

Keywords

Three Gorges Project / construction / diversion / earth rock / concrete

Cite this article

Download citation ▾
Wen Yonghong,Xie Xiangrong,Fan Wuyi. The construction design and practice of Three Gorges Project. Strategic Study of CAE, 2011, 13(7): 111-116 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (679KB)

53

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/