300 m grade concrete faced rockfill dam adaptability and countermeasures

Ma Hongqi

Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (12) : 4 -8.

PDF (1616KB)
Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (12) : 4 -8.

300 m grade concrete faced rockfill dam adaptability and countermeasures

Author information +
History +
PDF (1616KB)

Abstract

This paper summed up the main experiences and lessons of 200 m grade rockfill dam construction,analyzed 4 typical projects of 300 m grade dam, put forward the scientific research and key technical problems of 300 m grade dam.

Keywords

concrete face rockfill dam / adaptability / countermeasure research

Cite this article

Download citation ▾
Ma Hongqi. 300 m grade concrete faced rockfill dam adaptability and countermeasures. Strategic Study of CAE, 2011, 13(12): 4-8 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (1616KB)

64

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/